Shared resources in production systems: (max,+) analysis

TitreShared resources in production systems: (max,+) analysis
Type de publicationArticle de revue
AuteurBoutin, Olivier, Cottenceau, Bertrand , Loiseau, Jean-Jacques, L'Anton, Anne
TypeArticle scientifique dans une revue à comité de lecture
Année2011
LangueAnglais
Date2011
Numéro2
Pagination125 - 147
Volume3
Titre de la revueInternational Journal of Mathematics in Operational Research
Mots-clés(max,+) linear systems, conflicts, dioids, discrete event systems, interval analysis, job shops, Manufacturing cells, modelling, Petri nets, Production management, pseudo-periodic assignment policy, shared resources
Résumé en anglais

This paper deals with formal modelling of Petri nets including shared resources. These phenomena appear widely in the production management context, for the modelling of manufacturing cells. But, they usually cannot be formally represented in dioid algebraic structures based on sets of scalars. In this paper, we design a method to describe such a phenomenon in a dioid of intervals. In fact, the resource-sharing problem is turned into a time uncertainty problem, regarding the access to the shared resource. In this new problem, time uncertainties are bounded and can be described by intervals. Both bounds of the behaviours of the studied production systems can be manipulated in the scope of the ℤmax dioid, even though the original systems are not ℤmax linear by essence.

URL de la noticehttp://okina.univ-angers.fr/publications/ua1380
DOI10.1504/IJMOR.2011.038907
Lien vers le document

http://dx.doi.org/10.1504/IJMOR.2011.038907